Your SAP.
Our infrastructure.
One operating layer.
Managed cloud infrastructure designed around SAP Business One workloads, users, database requirements, availability and recovery.
The cloud layer should disappear into the experience.
Users care that SAP opens fast, stays available and recovers cleanly. We work backwards from that outcome.
Users & branches
SAP Business One
SQL / HANA layer
Backup & recovery
Right-size before you migrate.
CPU, memory, storage, database behaviour, user patterns and integrations matter more than a generic “cloud server” specification.
Design recovery before you need it.
Backup strategy, monitoring and recovery expectations should be part of the architecture — not an afterthought after migration.

Migration is not the end point.
We can support the infrastructure lifecycle: planning, deployment, access, monitoring, backup, capacity and practical coordination with your SAP partner or internal team.
Planning an SAP move, upgrade or infrastructure refresh?
Send us your current SAP environment and user profile. We can start with an architecture conversation.
SAP on Cloud Hosting: frequently asked questions.
What does SAP on Cloud hosting include?
It covers infrastructure designed for the SAP workload, secure connectivity, monitoring, backup and operational support. The exact scope depends on the SAP landscape and business requirements.
Is the SAP infrastructure located in Mumbai?
OVERTURES can provide managed infrastructure from its Mumbai co-location environment, subject to capacity, architecture and compliance requirements.
Can an existing SAP system be migrated?
Yes, after assessing database size, operating system, integrations, downtime tolerance, connectivity and the responsibilities of the SAP application partner.
How is SAP cloud capacity selected?
Sizing is based on the existing landscape, user load, database growth, batch processing, availability and recovery targets rather than a generic server package.
Does hosting include SAP functional support?
Infrastructure management and SAP functional or Basis responsibilities are defined separately in the proposal so ownership is clear before migration.
